chore(deps): update golang docker tag to v1.26.1 - autoclosed #106

Closed
Renovate-Clanker wants to merge 1 commits from renovate/golang-1.x into main
Collaborator

This PR contains the following updates:

Package Type Update Change
golang final patch 1.26.0-alpine1.26.1-alpine

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled because a matching PR was automerged previously.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | golang | final | patch | `1.26.0-alpine` → `1.26.1-alpine` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Disabled because a matching PR was automerged previously. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0My43My4yIiwidXBkYXRlZEluVmVyIjoiNDMuNzMuMiIsInRhcmdldEJyYW5jaCI6Im1haW4iLCJsYWJlbHMiOltdfQ==-->
Renovate-Clanker added 1 commit 2026-03-19 23:07:40 +07:00
chore(deps): update golang docker tag to v1.26.1
Tests / Run Tests (pull_request) Successful in 2m1s
cf482c00ae
Renovate-Clanker changed title from chore(deps): update golang docker tag to v1.26.1 to chore(deps): update golang docker tag to v1.26.1 - autoclosed 2026-03-20 14:43:18 +07:00
Renovate-Clanker closed this pull request 2026-03-20 14:43:18 +07:00
Some checks are pending
Tests / Run Tests (pull_request) Successful in 2m1s

Pull request closed

Sign in to join this conversation.
No Reviewers
No Label
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: bagas/tunnel-please#106